Installation Instructions For Sterling Shower Doors

Measuring and cutting the tracks the top and bottom tracks supplied by the manufacturer must.
Installation instructions for sterling shower doors. This shower door is designed to be specifically paired with a sterling shower module. Our shower doors are customized for your space so having a new one ordered fabricated and delivered could take up to 3 weeks. If your shower system is complex installation could take longer. Do not install this shower door if you do not have a sterling shower module installed.
Whiston pivot shower door with return panel for corner enclosure 73 h x 33 1 4 35 1 4 w with 1 4 thick clear glass 572084 36s g05 954 65 list price select color silver frame finish with smooth clear glass texture. The installation which is essentially the same for a stall shower or tub shower is a no brainer. If you re tired of dealing with a leaky mildew stained shower curtain on an existing shower installing a shower door might be a perfect solution. Refer to the installation guide for specific installation details for your product.
The following directions will assist in the installation of the sterling ensemble bath and shower module. However the actual installation of your new shower door can be completed by our professional installers in 2 3 hours. Pay special attention to the section titled very important instructions. Failure to follow the directions could result in product damage.
The delta shower door program offers very thorough installation instructions that feature detailed illustrations and text to provide as much information as possible in a simple and easy to follow format. Toilet installation tips from the wax ring to the tank lid these tips will guide you through easy installation. Place fabric pad if included to cover all feet of the bath. A key ingredient to any successful bathtub or shower door installation is the careful review and thorough following of the instructions.